In this case study:
The Issue
A well known snack manufacturer struggled to source Siemens components for their packaging line. Without these parts, production delays threatened their ability to meet a critical order deadline.
The packaging line at a leading snack manufacturer came to a standstill when critical Siemens components failed. These parts were obsolete and no longer available, creating an urgent need for a solution to prevent major disruptions. Every hour of downtime risked missed delivery deadlines and strained relationships with their retail partners.
Without replacement parts, the manufacturer faced costly delays, potential production losses, and a backlog that threatened their ability to fulfil future orders on time.
The Solution
CJS Automation quickly located and shipped the required Siemens parts from stock. Uderstanding the urgency, the team prioritised the order and arranged for expedited shipping. The shipment reached the manufacturer within two days, the parts arrived at the manufacturer’s facility, allowing their engineers to install the replacements immediately. This swift response prevented further delays, minimised downtime, and helped the manufacturer stay on track with their delivery commitments.
What The Client Said
“We were struggling to find these parts, but CJS Automation came through for us. Their speed and reliability kept our production on schedule.”
Thanks to CJS Automation, our production line is back on track, allowing us to meet deadlines and deliver quality snacks to our customers.